Miniature 2023/07/X/ST8/01193 - scientific activity funded by the National Science Centre (implementation period 2023-2024)
Preliminary Studies of Thermodynamic Cycles with Low-Boiling Medium 73DE
COMPLETED RESEARCH PROJECTS
Leader project ACTIVERING, financed by NCBR
implementation period: 2019-2022
Active foil bearings with variable dynamical properties
Opus 14 project, financed by NCN and coordinated by AGH
implementation period: 2018-2022
Mechanisms of stability loss in the high-speed foil bearings – modelling and experimental testing of thermomechanical couplings
Implementation project VoltAeris No. POIR.04.01.04-00-0014/17
implementation period: 2018-2022
Universal micro-cogeneration system with a gas turbine
Biostrateg (TechRol) project No. 3/344128/12/NCBiR/2017
implementation period: 2018-2022
New eco-energy technologies for the sustainable development of rural areas and low-carbon agricultural production
Sonata 11 project No. 2016/21/D/ST8/01711, financed by NCN
implementation period: 2017-2020
Research and modelling of anti-vibration processes occurring in the high-speed bearings with variable geometry
Project No. POIR.02.03.02-22-0009/15-00
implementation period: 2016-2018 The development of a new product, namely a 1 kW oil-free microturbine with components made of plastic, as part of a cogeneration system for use in individual households. The project was implemented in cooperation with SARK Sp. z o. o.
Preludium 9 project No. 2015/17/N/ST8/01825, financed by NCN implementation period: 2016-2018 The adequacy ranges of the linear and nonlinear methods for determining the dynamic properties of rotating machines
Project No. PBS1/A6/6/2012 implementation period: 2012-2015
Application of thermoelectric materials to improve the thermal stability of high-speed rotor bearings
Strategic programme financed by NCBR – Advanced energy generation technologies implementation period: 2010-2015 Research task No. 4: Development of integrated technologies for fuel and energy generation from biomass, agricultural waste and other
The key project No. POIG.01.01.02-00-016/08 implementation period: 2008-2014 Model agroenergy complexes as an example of distributed cogeneration based on local and renewable sources of energy
Project No. POIG.01.03.01-00-027/08-00 implementation period: 2008-2012 Use of smart materials and structures to develop innovative bearing systems for the rotors of power microturbines
Project No. PBZ-038-06 implementation period: 1995-1998 Development of modern diagnostic systems for the turbine sets operating in national high-power power units
Nie pamiętam hasła.
Please enter your username or email address. Instructions for resetting the password will be immediately emailed to you.